      Installation, safety operation rules rock particles machine
      Rock particles machine installation instructions
        1, rocking granule machine for the packing, after devanning moved to appropriate use of local, you can use the pad after.
        Unit 2, electrical wiring, is not subject to the direction of rotation limit, line is composed of a base below through the belt cover connected to the switch card, cable clamp.
        Swing granulator operation rules
        1 check the rock particles machine parts fasteners are loose, the hopper and no sundries, lubricating oil is sufficient worm gear reducer. Start rocking particle machine, mix into the bucket, the swing rotary drum, squeeze the material particles are formed through the screen, such as grinding pieces, should gradually joined, not filled, so as to avoid the pressure is too large, and the screen vulnerable. Powder hopper such as powder stop, must not be hand to shovel, so as to avoid the injury accident, application of bamboo spatula or stop work.
        2 electrical control combined switch for HJ1010/3 type, combination switch is located on the left side of the fuselage, directly control the motor start and stop, idle for two minutes, no abnormal phenomenon can work.
        3 five angle hob on both sides of a two screen tension rod, rod end is provided with a bakelite knob and a ratchet wheel, to the hopper lateral rotation knob, can make the screen to collapse, ratchet and pawl prevent screen loose, tighten the two fastening screws work, avoid the screen tension rod axial moving.
        4 screen number should be selected in accordance with the required particle size, according to the requirements of users of self.
        5 screen width equal to the length of the hopper file 200mm. Length should be able to guarantee the wrap angle of five hob, the two ends of the locking rod embedded screen slot and at least a week for the appropriate wrapping.
        6 hopper front cover and back cover of the gear shaft with an adjustment screw, you can adjust the five corners of the hob and gear axial clearance.
        Rock particles machine maintenance
        1, regular inspection of rock particles machine parts, was once a month, check the worm, worm, bearings and other activities are flexible and wear, found absenteeism depression should be repaired in a timely manner, not free to use.
        2, rocking granule machine should be kept in dry, clean room, the air shall not contain acids, and other parts with corrosive gases flowing place.
        3, rock particles machine once after use or shutdown, should remove the rotary drum washing and brushing bucket remaining powder, and then reassembled, prepare for the next use.
        4, such as stops for a long time, must will swing particle machine body wipe clean, parts of the surface coated with anti-rust oil, cloth on the cover.
      Related News:
      · Innovation, energy saving, environmental protectio  
      · Vacuum dryer product performance characteristics a  
      · Vacuum dryer used for inspection and debugging wor  
      · Difficulties and reasons cannot start mixing machi  
      · The correct operation method using vacuum dryer  
      · Development advantages and characteristics of dome  
      · The difference between the special vacuum dryer an  
      · Detailed description of each component characteris  
      · The dominant position in the whole vacuum dryer dr  
      · Trough type mixer sometimes appear large area leak  
      Related Products:
      · PGL Spray Drying Granulator
      · High speed mixer
      · SET series double screw extrusion pelletizer
      · VI forced mixer
      · Mixing machine W series
      · Powder machine ZSJ series vibrating screen
      · FZ series of crushing granulator
      · Chinese medicine grinder
      · DWT series of drier for dehydrated vegetables
      · Multi-layer belt dryer

      Copyright 2013 Chang Zhou Zhizun Machinery Co.,Ltd All Rights Reserved.Design by Reach.
      Tel:86.519-88906508 Fox:86.519-88902679 Add:Jiaoxi Changzhou Jiangsu Pro China P.C:213116

      主站蜘蛛池模板: 成人午夜视频免费看欧美| 碌曲县| 国产熟妇另类久久久久婷婷| 欧美人牲交a欧美精区日韩| 精品免费国偷自产在线视频| 国产精品久久久影视青草| 麻豆国产原创视频在线播放| 精品久久久久久无码中文字幕| 伊人蕉久影院| 久久久成人毛片无码| 国内a∨免费播放| 龙里县| 亚洲欧洲国产综合aⅴ无码| 国产日韩精品欧美一区喷| 找国产毛片看| 中文字幕无码精品亚洲35| 亚洲国产一区二区三区 | 国产aaaaa一级毛片| 日韩精品成人在线| 亚洲欧美另类久久久精品播放的| 久久久久高潮喷水无码| 亚洲AV色香蕉一区二区蜜桃| 特级aaaaaaaaa毛片免费视频| 8AV国产精品爽爽ⅤA在线观看| 性一交一乱一伦一视频一二三区| 国产精品美女黄| 亚州AV无码一区东京热久久| 成年片色大黄全免费网站久久| 免费一级成人毛片| 国产偷抇久久精品a片69| 99re6这里有精品热视频 | 国产精品无码av片在线观看播放| 女人乱人伦国产在线观看| 乱色熟女综合一区二区| 在线无码va中文字幕无码| 日韩视频福利| 欧美日本激情| 西西午夜无码大胆啪啪国模| 久久久久无码精品国产人妻无码 | 中文字幕乱码亚洲影视| 惠来县|